AllXBTUSD1282.4+2.08%XBTM171296.8+2.75%LTC7D0.01173-3.38%ETC7D0.003087-1.15%ETHJ170.03918-2.03%REP7D0.010500-10.84%XRP7D0.00002546+2.13%XBJM17143570+3.14%DASHJ170.056699-1.19%XMRJ170.015699-2.58%GNOM170.060000+88.89%FCT7D0.005250-1.32%ZECM170.053734-0.65%XBCM177941.0+0.05%B_BLOCKSZ1727.00+0.00%B_SEGWITZ1737.01+0.00%.BXBT1279.94+1.98%.XBTCNY7347.35+1.62%.XBTJPY141979.00+2.52%.ETHXBT0.03904-1.06%.ZECXBT0.0545100-0.20%.BVOL24H1.43-3.38%Funding: @ 0.1155%Time:
Risk Limits

Overview

BitMEX imposes risk limits on all trading accounts to minimise the occurrence of large liquidations on margined contracts.

As users amass larger positions, they pose a risk to others on the exchange who may experience a deleveraging event if the position cannot be fully liquidated. The Step model helps avoid this by increasing margin requirements for large positions.

Dynamic Risk Limits

Each instrument has a Base Risk Limit and Step. These numbers combined with the base Maintenance and Initial Margin requirements are used to calculate your full margin requirement at each position size.

As the position size increases, the maintenance and initial margin requirements will increase. Users must authorize a higher or lower risk limit on the Positions panel. Margin requirements will automatically increase and decrease as your risk limit changes.

Instrument Risk Limits

Symbol Base Risk Limit Step Base Maintenance Margin Base Initial Margin
REP7D 50 XBT 50 XBT 5.00% 10.00%
XBTUSD 200 XBT 100 XBT 0.50% 1.00%
XBTM17 200 XBT 100 XBT 0.50% 1.00%
XBJM17 200 XBT 100 XBT 0.50% 1.00%
XBCM17 200 XBT 100 XBT 0.50% 1.00%
DASHJ17 50 XBT 50 XBT 2.50% 5.00%
ETHJ17 50 XBT 50 XBT 1.50% 3.00%
ETC7D 50 XBT 50 XBT 2.50% 5.00%
FCT7D 50 XBT 50 XBT 2.50% 5.00%
GNOM17 50 XBT 50 XBT 25.00% 50.00%
LTC7D 50 XBT 50 XBT 1.50% 3.00%
XMRJ17 50 XBT 50 XBT 2.00% 4.00%
XRP7D 50 XBT 50 XBT 2.50% 5.00%
ZECM17 50 XBT 50 XBT 10.00% 20.00%

Formulas

Term Formula XBTUSD Example (1 Step)
New Maintenance Margin % Base MM % + ( Steps * Base MM % ) 0.50% + ( 1 * 0.50% ) = 1.00%
New Initial Margin % Base IM % + ( Steps * Base MM % ) 1.00% + ( 1 * 0.50% ) = 1.50%
XBT Maintenance Margin New MM * Gross XBT Position Value 1.00% * 300 XBT = 3 XBT

More Information

Further information is available on:

  • How to Adjust Risk Limits
  • Trade Examples